Project scope
IMH responsibility: Field installation.
- 40-ton double-girder bridge crane
- 80-foot bridge span
- Bridge and hoist placement
Installation of a 40-ton double-girder bridge crane with an 80-foot span. Explore the bridge placement, hoist details, and views from inside the installation bay.

From girders staged on the floor to the bridge overhead. Explore the crane placement, installation equipment, and hoist connections through wide views and close-up photographs.
01 / 08 photos
A moving view of the bridge crane and surrounding installation area. Watch the full recording for a closer look at the scale of the work.
Open the full video ↗ (opens in a new tab)IMH responsibility: Field installation.
The 40-ton capacity and 80-foot span describe the equipment. The installation photographs also show why delivery, girder staging, bridge assembly, and access inside the bay need a coordinated field plan.
Bring the capacity, span, bay dimensions, runway information, delivery route, and access limitations. Establish engineering and acceptance responsibilities with the project team.
Explore bridge crane installationA new line. A better lift. A demanding installation.
Bring us your goal. We’ll help define the next step.